|
25-324
| 1 | 4. | | Minutes | December 3, 2025
December 10, 2025 | | |
Not available
|
Not available
|
|
25-272
| 1 | 5. | | Project | (Recommending a continuance without opening the public hearing to 03/11/26)
Project No. PRJ2024-001044-(5)
Planner: Christopher Keating, AICP
Applicant: Pronghorn Solar Plus, LLC
APNs 3378-003-001, 3378-004-008, 3376-006-012, 3376-011-035
Antelope Valley Planning Area
a. Conditional Use Permit No. RPPL2024001545
To authorize the construction, operation and maintenance of a utility-scale solar facility consisting of a 50-megawatt photovoltaic facility and an accessory 50-megawatt battery energy storage system on 248 acres in the A-2-2 (Heavy Agricultural – Two Acre Minimum Required Lot Area) and C-RU (Rural Commercial) Zones.
b. Environmental Assessment No. RPPL2025003806
To consider a Mitigated Negative Declaration with impacts to aesthetics, agriculture/forestry, air quality, biological resources, cultural resources, hazards/hazardous materials, transportation, and tribal cultural resources reduced to less than significant with mitigation measures pursuant to CEQA requirements. | | |
Not available
|
Not available
|